Tuesday, June 23, 2009

Plastered - Pt 2

Now we have our walls plastered they just need to be 'finished off' and then the cornices will go in place.

Below we are looking back to the living space from our kitchen.



Here we are looking from the dining space over to the living space.



And the master bedroom which looks smaller than it really is. I promise, it's actually quite large.


Sunday, June 21, 2009

Plastered - Pt 1

After a week or so of delays our plastering began on Thursday last week, first it was the ceiling which was installed in one day and then on Friday the wet areas were completed. The rest of the plaster will hopefully (fingers crossed) be completed in the next week just in time for our cabinet makers to get going.

Here is the view back to the front door from the entrance hallway.



Our open plan kitchen/dining/living area. Currently looking rather messy, cluttered, and dangerous for small children, hopefully our interior will be slightly less messy, cluttered and dangerous.



Our ensuite including plaster cut-out for the spa. Yeah, the spa, you'll just have to visualise for now though okay.



The laundry. It looks small but it's not really, it will be quite roomy actually.



Tuesday, June 16, 2009

We are insulated

Our plasterboard is on site and today the insulation was installed in all the walls and a part of the ceiling. The rooms feel 'enclosed' now and the spaces within the house are much more real. Now they can whack up the plasterboard and we'll be looking good.



Above is our main living area looking back towards the open plan kitchen, below is our rumpus.



Yesterday the roof capping was finally in place after the gutters and fascia around the portico were finally sorted out. It seems the builder was 'winging' our custom portico design, so once the brickies had the portico up the roof was shaped around it.






After visiting our cabinetmakers again yesterday to sign off on our kitchen and cabinets we made a few late unexpected changes. The selection blog entry has been amended accordingly and you can see the links to our new selections. Our changes are from a 'Platinum Essa Stone' benchtop to a 'Basmati Essa Stone', we also have been forced to change our main bathroom vanity due to our Laminex being deleted, it's a good change though as we love the new 'Zincworks Laminex' that we have selected and have picked it now for our laundry as well as the main bathroom. Hopefully only a few weeks until we see the kitchen installed according to our cabinetmaker and site manager. Exciting stuff...

Thursday, June 4, 2009

Brickwork - check!

Just before lunch today the brickies polished off the last of our portico, now it looks like a house. Notice the precise brickwork on the left that will be left exposed and then the less precise study on the right that will be rendered.



The portico itself has given our builder something to think about as they try to make our roof and gutters fit into the facade correctly. They will get it right because they have to!

The portico will be rendered for those of you that may be wondering.



We also have had first fix of our ducted vacuum installed. My back already feels better just looking at the inlets, and you can just about hear that tiny 'whirr' as the almost-silent vacuum fires up on demand.






Sunday, May 31, 2009

Selection list

So yeah this house is coming along well but what's it really going to look like, I mean what about those selections. Okay then, here they are.

EXTERNAL
Bricks - PGH Oyster [link]
Roof - Colorbond Surfmist [link]
Render - Solver Volcanic Ash (study area) & Solver Beaver (portico)
Garage door - Monument [link]
Front door - Monument
Window frame - Metro Silver

KITCHEN
Benchtop - Essastone Basmati (40mm) [link]
Cupboards - Laminex Polar White
[link]
End wall of kitchen (surround for oven, pantry door) - Laminex Licorice Linea [link]
Splashback - Mosaic Glass Vetro Fine Silver Gloss

MAIN BATHROOM
Vanity benchtop - Laminex Zincworks [link]
Vanity cupboards - Laminex Polar White
Floor tile - Essential Charcoal
Wall tile - Gloss white
Feature (down shower wall) - Mosaic Glasstone Fresh Smoke

ENSUITE
Vanity benchtop - Laminex Morning Shale [link]
Vanity cupboards - Laminex Polar White
Floor tile - Essential Charcoal
Wall tile - Gloss white
Feature (down shower wall) - Mosaic Glass Crystal Summer Green Mix

FLOORING
Floorboards - Strand woven Bamboo in Natural colour (hallway, kitchen, dining, living) [link]
Carpet - Valley Ridge Ghost Gum (study & rumpus)
Carpet - Amaretti Vintage (bedrooms)

PAINT
Solver First Snow throughout

Wednesday, May 27, 2009

Bricks are laying

Today we have witnessed the first signs of brickies on our site, not only do we have nice little stacks of bricks neatly placed around the perimeter we also have a bit of a back wall. The mortar colour looks a touch dark but it hadn't dried completely yet, a shower had just passed through so the bricks look a darker grey than they will when clean and dry.



All in all, first impressions and we are really happy with our 'Oyster' bricks. We are also overly impressed by the quality of the brickies work. They keep a 'clean brick' that's for sure, immaculate work, great detail and very encouraging. We look forward to seeing the rest go up in the same manner.



Thursday, May 21, 2009

Under blue skies

A much nicer day to show off our roof this time. First fix power, gas and plumbing have been completed as well. Brickies may be around tomorrow to start up, so a week or two and we should be looking good.






Surfmist under blue skies.